December 2015 to June 2016. Forepeak and Main Bulkheads, Prime Deck and Coachroof.

Above Decks:

Preparation of coachroof, cockpit and decks for painting.

This slideshow requires JavaScript.

 

Painting with three coasts of Jotun’s Penguard epoxy primer.

This slideshow requires JavaScript.

Below decks:

Reinforcing Glass the tabs fixing the two main bulkheads below the mast to GRP hull sides. Fillets will prevent the formation of hard spots between the bulkheads and hull.

 

This slideshow requires JavaScript.

Replacing fore-peak bulkheads – Robin’s marine ply, Afromosia trim and WEST filleting and glass tabs.

 

This slideshow requires JavaScript.

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s